Arad Airport

Technical Information

Airfield dimensions and relevant information

Concrete runway with a dimension of 2000 x 45 m and shoulders of 7.5m on both sides.
Landing directions 09 and 27:
RWY ID 09 27
Orientation 095º28’ 275º30’
Length (m) 2000 2000
Width (m) 45 45
Strenght 41R/C/W/T 41R/C/W/T
Strip (m) 2120×300 (înierbată) 2120×300 (înierbată)
RESA (m) 240×90 (înierbată) 220X90 (înierbată)
TORA (m) 1820 2000
TODA (m) 1820 2500
ASDA (m) 1820 2000
LDA (m) 1820 1820
Balizaj
APCH Calvert, 720 m, W LIH ALPA-ATA CAT II, 570 m
THR G LIH G LIH
PAPI 3 ○ 3 ○
TDZ nil 900 m, W LIH 30 m spacing
RWY CL 900 m, W LIH 600 m, R/W LIH 300m, R LIH 30 m spacing 900 m, W LIH 600 m, R/W LIH 300m, R LIH 30 m spacing
RWY EDGE 1200 m, W LIH 600 m, Y LIH 60 m spacing 1400 m, W LIH 600 m, Y LIH 60 m spacing
RWY END R LIH R LIH

Standard Taxi Routes

Takeoff Runway 27 Apron 1 or 2, taxi via TWY A, takeoff THR 27
Runway 09 Apron 1 or 2, taxi via TWY A, taxi via RWY, return at THR 09, takeoff
Landing Runway 27 Landing, return to runway, taxi via RWY, exit RWY via TWY A, parking Apron 1 or 2
Runway 09 Landing, exit TWY A, parking Apron 1 or Apron 2

Physical Characteristics

 

Track: 41R/C/W/T
Taxi runway Alpha: 28 R/C/W/T
Apron 1 : 6 R/C/W/T
Apron 2 : 41R/C/W/T


Arad Airport has an Idman – Finland system of lighting with the following subsystems:

  • Landing – takeoff runway lighting
  • CAT II approach lighting on direction 27
  • CAT I approach lighting on direction 09
  • Landing path PAPI 27 visual indicator
  • Landing path PAPI 09 visual indicator
  • Alpha taxi lighting
  • Illuminated guiding panels
  • TWY A marginal, axial lighting and Stop bar
  • TWY TWY CL TWY EDGE STOP BAR
    A G LIH Y/G LIH 30 m spacing B LIL 60 m spacing R LIH

Description of approved operations

  Runway 09
  • VOR / DME inaccuracy approach
  • Commercial passenger and cargo air transportation, aerial work and general aviation
  • Day and night operations


Runway 27

  • CAT I and CAT II precision approach
  • Passengers and cargo commercial air transportation, aerial work and general aviation
  • LVO operations with RVR> 350m and DH> 30m
  • LTVO operations
  • Day and night operations
Skip to content